Eclipse AVN4429 Installation Manual Page 15

  • Download
  • Add to my manuals
  • Print
  • Page
    / 15
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 14
-
15
-
Deutsch Español Français Italiano
Nederlands
SvenskaEnglish
Chec
Chec
king oper
king oper
ation after installation
ation after installation
Install the PND to the main unit.
1
Insert the ignition key into the vehicle and start the
engine.
2
Check the connection status for each signal in a place
where they are easy to see.
3
Use the “GPS signal” gauge which is displayed in the
lower-right corner of the map screen to check the
reception status.
4
Do not turn the ignition key to ACC OFF or operate the
main unit until the navigation screen appears.
Check that the shift position is correct and that
the area around the vehicle is safe before
starting the engine.
Tip
1
11
Check that the gauge is white.
"ECLIPSE" is a registered trademark of
FUJITSU TEN LIMITED in 54 countries.
Page view 14
1 2 ... 10 11 12 13 14 15

Comments to this Manuals

No comments